Jira
Tool class: Task management
In Jira, a topic’s task management surface is one project. The project key is the topic code, so every issue key starts with the code.
Set up the surface for one topic
These steps use the example topic Example Co Operations (topic code EXOP).
- Confirm the topic in the registry. In many organizations the list of Jira projects is the registry. If no project matches the topic and a new topic is needed, report a registry gap and wait for approval.
- Search the existing projects for the key
EXOPand for the name. If a project already exists, use it. If two exist, record a provisioning gap. - Create a project named
Example Co Operationswith the keyEXOP. A Jira project key starts with an uppercase letter and is 2 to 10 characters long by default. Jira also allows digits in keys, but a topic code uses the uppercase letters A to Z only (see rules for codes). A four-letter topic code fits. - Choose a project type that matches your other topic projects. Company-managed projects share configuration set by administrators. Team-managed projects are configured inside each project. Use the same type for every topic where you can.
- Apply the organization’s shared configuration: issue types for the Focus System and for action records, the workflows, and the issue link types.
- Set the project lead to the topic owner or the maintainer.
- Grant access through the topic’s access groups (see Permissions).
- Set the project category to the topic’s unit, for example
Operations. - Create the default focus items: the objective
Example Co Operations Objectiveand the intentionExample Co Operations Intention, linked with a contributes to link. - Add the project link to the topic profile and to the purpose page.
Settings
Jira administrators configure issue types, workflows, fields, link types, and permissions. In company-managed projects these are shared through schemes, so one change can affect many projects. In team-managed projects they are set per project.
For TFW, the configuration should provide:
- Issue types for objective, intention, strategy, task, decision, blocker, idea, asset, and role, or a documented mapping from the types you have to these levels. A unit can add its own action types, for example bug in an engineering topic; document how each one maps to the action level.
- Workflows. Focus items and roles use the lifecycle statuses: Identified, Active, Downstream, and Inactive. Tasks, blockers, and ideas use the action workflow statuses: Identified, Accepted, Work Started, Blocked, Clarification Needed, Clarification Provided, Resolution Proposed, Closed, and Resolution Rejected. Blocked can be entered from any status and left to any status. Decisions use a subset of the action workflow: Identified, Clarification Needed, Clarification Provided, Resolution Proposed, Closed, and Resolution Rejected. Assets use their own statuses: Identified, Work Needed, Active, and Inactive.
- An issue link type for Focus System links, with the outward description “contributes to” and the inward description “fulfilled by” (see contributes to). An action can have this link to several strategies, and a strategy can have it to several intentions.
- Project category set to the topic’s unit: Operations, Financial, MarCom, and so on. Filters and reports can then select every topic of one unit across ventures.
- Native fields for owner (assignee), priority, rank, and due date.
- The four action record fields. Each one has its own Jira field. Do not use one as a substitute for another.
TFW field Jira field Priority The Priority field, with the values P1(highest) throughP5(lowest). The priority scheme sets the values; an administrator configures them if the scheme uses other names.Urgency Optional. A custom date field for the latest sensible time to act, if the organization uses urgency. Jira has no urgency field by default. If the organization does not use urgency, leave it out. Whether the field exists, and its name, is an organization setting. Rank Jira’s Rank, which is the order of issues in the backlog and on the board. Change the order by moving the issue in the backlog. Due date The Due date field, for a commitment or an external deadline only. - Review date (optional). A date field for strategies that need a review outside the objective review.
- Review slot labels for objectives only:
focus-review-week-<1-4>andfocus-review-day-<weekday>. Every objective has both labels. Intentions and strategies have no review slot labels. Review the objectives at the objective level in a hierarchy view app for Jira, where the intentions, strategies, and actions under each objective are reviewed with it.
Do not create new issue types or link types in one project only. Ask an administrator to change the shared configuration so that all topic projects stay the same.
Permissions
- Grant project access to the topic’s access groups, not to individuals one by one: the venture group (for example
exampleco-venture), the unit group (operations-unit), and the topic group (exop-topic). Membership in any one of them grants access. Together the groups match the topic’s access boundary. - Use the same groups in Confluence. If the organization’s Jira and Confluence share one user directory, one set of groups serves both.
- Give administration of the project to the maintainer and one backup.
- If people outside the boundary need to see some issues, record the exception. Do not open the whole project to work around it.
- Automations that create or update issues use their own account inside the boundary.
Maintenance
The maintainer checks the project on a regular schedule:
- The name and key still match the topic.
- The configuration still matches the shared configuration. Note any local differences and remove them or record why they exist.
- Every action record links to at least one strategy. Find unlinked records and link them or close them.
- Every strategy links to at least one intention (often several) and has one owner. Every objective has both review slot labels.
- Old blocked records are reviewed. Either the condition is resolved or the blocker is restated.
- The access groups and roles still match the access boundary. No individuals have access outside the groups unless the exception is recorded.
When the topic becomes inactive:
- Set the lifecycle status of its focus items to inactive.
- Close or move open action records. A record that continues in another topic moves to that topic’s project and keeps a link.
- Remove create and edit permissions for most participants, or archive the project if your Jira plan supports it. Keep the history.
- Update the topic profile and the purpose page.
Agent notes
- Resolve the topic first. Find the project by its key, which is the topic code.
- Read the project configuration before you create an issue. Use the issue types, fields, and workflow that exist. Do not assume every project is the same.
- Search before you create. Look for an existing issue on the same subject.
- Link instead of copying. Put links to pages, files, and threads in the issue.
- Confirm before consequential writes: creating issues, changing status, reassigning, or editing many issues at once.
- Record facts with evidence links. Label estimates and options as estimates and options.
- Set priority, rank, and due date in their own fields. Do not raise the priority to move an issue higher in the backlog, and do not set a due date to show urgency.