Focus System

The Focus System is a hierarchy of four levels that records why work matters. It is kept in the task management surface of each topic. This page explains each level, how the levels link, which statuses they use, and how to write and use a strategy.

The examples on this page use an invented venture called Example Co. Its names, codes, and goals are illustrations only.

The four levels

LevelWhat it isLinks toEnds when
ObjectiveA durable target state or outcomeThe top levelIt is made Inactive
IntentionA desired direction toward an objective. It groups strategies.An objectiveIt is made Inactive
StrategyThe approach that work takes to fulfill one or more intentions. It groups actions and has one owner.One or more intentions, often severalIt is made Inactive
ActionOne piece of work, recorded as an action record: a task, or a more specific type such as a decision, blocker, idea, asset, or roleOne or more strategiesIt is Closed (a role or an asset: it is made Inactive)

The top three levels are focus items. They describe a direction and an approach, and they stay open while the direction is pursued. Actions are the work itself. Most actions are closed when they are done. A role is the exception: it lasts as long as the responsibility exists.

Each lower level links to the level above it:

Read upward, the link is contributes to. Read downward, the same link is “fulfilled by”: an objective is fulfilled by its intentions, an intention by its strategies, and a strategy by its actions. Use only these two phrases for Focus System links, so that people and AI agents read every link the same way.

The links give every action at least one path through a strategy and an intention to an objective. When someone asks why an action exists, you can follow the path upward and read the answer.

Rules for links:

Objectives

An objective is the top level. It states a target state or outcome that stays relevant for a long time, usually a year or more. An objective does not say how the outcome will be reached. That is the work of the levels below it.

An objective has an owner and a review slot. It is reviewed in the objective review, together with everything under it (see reviews).

Intentions

An intention is a desired direction toward an objective. It is narrower than the objective and states what should change, but not the method. An objective usually has a small number of intentions.

An intention has an owner and a review slot, and links to one objective. It is fulfilled by one or more strategies. An intention without a strategy has no plan: nobody has stated how the direction will be pursued, so no action can be linked to it.

Strategies

Why the strategy level exists

An intention states a direction. An action is one piece of work. Between them there is a choice: which approach will the work take? The same intention can be pursued in several ways, and each way leads to different actions. The strategy level records that choice.

Without a stated approach, two problems appear:

What a strategy is

A strategy is the way in which work goes about fulfilling one or more intentions, and through them, one or more objectives. One approach often serves several intentions. It states the approach, the scope of the approach, and how to tell whether the approach works. A strategy is not a single piece of work and it is not a goal. It is between the goals (the intentions) and the work (the actions). For example, the EXOP strategy “Hold stock of the most-ordered products for same-day shipping” contributes to the intention “Reduce the time from order to delivery” and to the intention “Lose fewer sales to stock shortages”.

How a strategy is used

How to write a strategy

A strategy record contains:

Common mistakes with strategies

Sub-strategies

A strategy can contain sub-strategies when it needs to be divided, for example when two parts of the approach have different owners or need different reviews. A sub-strategy links to the strategy above it with a contributes to link, and it follows the same rules as a strategy: it has an owner, it can have a review date, and it groups actions.

Add a sub-strategy only when it helps planning or review. If a strategy has only a few actions, it does not need sub-strategies.

Actions

An action is one piece of work that contributes to one or more strategies. Each action is kept as an action record in the task management surface of its home topic.

A task is the general type of action. The other types are more specific types of action:

TypeUse it for
TaskA defined action with one accountable owner and a completion condition. Use it when no more specific type fits.
DecisionA choice, with its rationale, the person who made it, and the date
BlockerA present condition that prevents progress
IdeaA possible action that is not yet defined well enough to do
AssetA thing that the topic acquires, holds, or maintains, such as equipment, a domain name, or a subscription
RoleAn ongoing responsibility and the person who holds it

Every action belongs to one topic, its home topic, and links to at least one strategy. It commonly contributes to several strategies, which can be in different topics.

A role describes an ongoing responsibility. It is not closed when one activity ends, so it does not use the action workflow. A role uses the four lifecycle statuses Identified, Active, Downstream, and Inactive: it is Active while the responsibility exists, and it is made Inactive when the responsibility ends. A role is never Blocked or Closed.

An asset also does not use the action workflow. It uses its own statuses: Identified, Work Needed, Active, and Inactive. A decision uses a subset of the action workflow, without Accepted, Work Started, or Blocked; what blocks a decision is recorded as a blocker linked to it.

A unit can add its own action types, for example a bug in an engineering topic. Each added type is an action: it maps to the action level, links to at least one strategy, and uses the action workflow unless it describes an ongoing responsibility like a role. Record each added type and its mapping where the task management tool is configured.

Default focus items

When a topic is created, create one default objective and one default intention in its project:

New strategies then always have at least one intention to link to, and actions that do not yet fit a strategy have a place in the Focus System. When more specific objectives and intentions exist, link new work to them, and move existing links when the review shows a better fit. The default focus items stay Active while the topic is Active.

Statuses

Focus items and actions use two different sets of statuses.

Objectives, intentions, and strategies use the four lifecycle statuses. Topics use the same four statuses.

StatusMeaning for a focus item
IdentifiedA candidate. Details may be incomplete.
ActivePursued now.
DownstreamAccepted for later. No action is needed now.
InactiveNo longer pursued.

Tasks, blockers, and ideas use the action workflow statuses: Identified, Accepted, Work Started, Blocked, Clarification Needed, Clarification Provided, Resolution Proposed, Closed, and Resolution Rejected. Decisions use a subset: Identified, Clarification Needed, Clarification Provided, Resolution Proposed, Closed, and Resolution Rejected. Roles use the lifecycle statuses. Assets use Identified, Work Needed, Active, and Inactive. The model page defines each one.

How the Focus System relates to TFW

TFW and the Focus System answer two different questions about the same work:

Every action belongs to one topic and contributes to at least one strategy. The topic decides where the record is kept and who can see it. The strategies explain why the record exists. Resolve the topic first, then link the record into the Focus System.

Example: Example Co

This example follows one path from an objective to its actions. All names and numbers are invented.

The actions with the EXOP code have their home topic in Example Co Operations. Task EXMC-31 has its home topic in Example Co MarCom, because the product pages are MarCom work. It contributes to the same strategy through a deliberate cross-topic link. It also contributes to a strategy in Example Co MarCom about product page content, so it has two contributes to links and one home topic.

On the review date, the owner finds that only 60% of orders for the selected products ship the same day, because the warehouse is too far from most customers. Both intentions are still wanted, so they stay Active. The owner makes the strategy Inactive and creates a new strategy that contributes to the same two intentions: “Ship the most-ordered products from a fulfillment partner near the largest customer region”. The open actions that still fit are linked to the new strategy. The others are closed with a recorded reason.

Reviews

The review method depends on the type of focus item.

A saved filter on the review slot labels lists the objectives due in a given week and on a given day. The near-term action review and the topic audit check actions and topics. See reviews by scope for the tempo, scope, and question of each review.